Environment and load review
Confirm exposure, temperature, corrosion category, UV, water, dust, condensation, loads, lifting, and installation orientation.
Checkpoint
Design inputs and responsibility boundaries recorded.
Quality System
ISO 9001
Manufacturing Lead Time
Quoted by Scope
500+
Projects Completed
25+
Countries Served
25+
Years Experience
Dongguan
China Factory
Fabex operates a quality management system certified to GB/T 19001-2016 / ISO 9001:2015.
GB/T 19001-2016 quality management system
Outdoor energy equipment
Energy equipment enclosures and mounts need a coordinated approach to corrosion, ingress, condensation, thermal behavior, grounding, and structural loads.
| Capability | Fabex scope | Engineering checkpoint |
|---|---|---|
| Materials and thickness | Selected for load, environment, corrosion system, weight, and joining | Material and finish should be specified as a compatible corrosion system. |
| Environmental details | Seams, gasket lands, drip edges, drainage, condensation paths, vents, and protected openings | Ingress and condensation risks should be reviewed in the installed orientation. |
| Thermal provisions | Passive vents, fan or exchanger interfaces, heat-spreader mounts, and service clearances | Thermal performance requires validation with the customer equipment and duty cycle. |
| Heavy enclosure and mount capacity | Reviewed from fabrication and lifting through transport and installation | Lifting points and field mounting interfaces need stated loads and responsibility. |
| Traceability and testing | Material, finish, weld, and inspection records defined per program | Required reports and test ownership must be agreed before order release. |
Send your drawing, material, quantity, and delivery target. Our team will review the process route, manufacturability risks, and open questions before quotation.
Environmental control
Orientation, exposure, heat load, drainage, service access, and mounting conditions shape the fabrication details.
Confirm exposure, temperature, corrosion category, UV, water, dust, condensation, loads, lifting, and installation orientation.
Checkpoint
Design inputs and responsibility boundaries recorded.
Review galvanic pairs, seams, drainage, gasket lands, vents, grounding, fasteners, coating, and field interfaces.
Checkpoint
Fabrication details support the intended corrosion and ingress system.
Inspect interfaces, welds, finish, hardware, masks, doors, gaskets, and agreed test features.
Checkpoint
Approval evidence completed before repeat production.
Retain material, finish, inspection, and revision evidence required by the program.
Checkpoint
Delivered equipment linked to the approved production record.
How we plan your project
See the commercial and engineering checkpoints Fabex uses to move this type of job from drawing review into controlled production.
Application
Drawing-defined sheet metal parts and assemblies
Material
Drawing-specified material and thickness
Quantity
Prototype through repeat production
Lead time
Confirmed after DFM and material review
An outdoor energy enclosure may need corrosion, ingress, condensation, thermal, grounding, lifting, and service requirements coordinated.
Confirm the environment and loads, review material and enclosure DFM, verify the first article, and retain the required production records.
Documented DFM findings, a proposed manufacturing route, quotation, and lead-time plan for your approval.
Energy equipment questions
Answers about outdoor corrosion, ingress, condensation, thermal design, and traceability.
State the substrate, pretreatment, coating system, color, thickness or performance requirement, exposure environment, dissimilar-metal contacts, edge treatment, and applicable test standard.
Fabex can fabricate the approved seams, openings, gasket lands, doors, and hardware. The rating applies only after the complete assembled enclosure is tested to the specified standard and configuration.
The system may use drainage, vents, heaters, insulation, thermal paths, sealed compartments, or controls. The installed orientation, temperature cycle, humidity, and electronics heat load are needed for design decisions.
Review dissimilar-metal contacts, fasteners, drainage paths, coatings, isolation materials, and damaged-edge exposure as one system. The final solution depends on the environment and service life.
Possible records include material certificates, heat or batch identification, coating records, weld and dimensional inspection, hardware records, and test reports. Confirm the required package during quotation.
The finish plan should address sharp edges, heat-affected areas, seams, drainage, exposed zinc, and coating access. Depending on the substrate and environment, the route may include edge preparation, zinc-rich repair, seam sealing, pretreatment, or a duplex coating system.
Customer Perspective
B2B customers often give brief, practical feedback and show their trust through the next project.
Selected customers
Full production programs, repeat orders, and multi-year supply — not one-off samples. References available for your sector on request.
In contract manufacturing, the clearest reward is often another drawing, another production order, or a larger scope.
We do not publish a customer's name, product, drawing or project details without written permission. That is not a lack of proof - it is how contract manufacturing works, and it is the same discretion we apply to your designs.
Send your drawings and requirements for an engineering review, project-specific quotation, and manufacturing plan.